Pitch fit
Start with usable ground or platform dimensions, access, orientation and spacing.

WHO WE WORK WITH / GLAMPING RESORTS
Start with the pitch, guest layout and operating routine. Then develop one physical sample before planning the rollout.
Illustrative design concept, not a photographed ASEN model. Confirm product and site suitability per project.
PROJECT FIT
Connect the physical unit to pitch constraints, guest comfort and the operating routine your property can maintain.
Start with usable ground or platform dimensions, access, orientation and spacing.
Define furniture, circulation, privacy, openings and the experience from inside and outside.
Include cleaning, maintenance access, removable components, storage and replacement needs.
LODGE MODELS
Choose a starting format by site role and guest space, then finalize materials, dimensions and operating requirements through the sample.

LARGE LODGE
A larger format for planning room use, openings and the relationship between the unit and its pitch.
Explore model details
OPEN-FRONT LODGE
Use the full opening to plan access, ventilation, furniture movement and guest-space presentation.
Explore model details
COMPACT LODGE
A smaller format for compact pitches and entry accommodation ranges.
Explore model detailsSPACE PLANNING
Use a physical interior to check floor area, furniture clearances, circulation and the position of openings.

04 / SITE DECISION TOOL
A useful quotation needs the site and guest plan, not only a tent size. Use these four decisions to define the unit your team should test.
Send Your Site BriefLocation, platform or ground size, access, orientation, exposure and unit spacing.
Buildable footprint and installation constraints.
Pitch plan and selected base format.
Occupancy, beds, furniture, luggage, circulation and privacy needs.
Interior clearances, zoning and usable space.
One furnished layout in the physical sample.
Season, cleaning, drying, storage, maintenance access and replacement needs.
Openings, removable parts, instructions and service set.
Operating routine and component list.
Unit count, phases, site delivery access, packing limits and target timing.
Sample scope, order split, packing and production plan.
Final unit specification and rollout schedule.
PROJECT SEQUENCE
Use the sample to settle the site's key questions and create one controlled specification for quotation and production.
Share location, pitch plan, intended season, unit count and guest layout.
Select a footprint and identify the changes required for the site.
Check space, openings, components and the agreed project requirements.
Freeze model revision, quantities, packing, spares and production timing.
BEFORE YOUR INQUIRY
Share location, expected exposure, intended season, ground or platform conditions, access, unit count and your desired interior layout.
Suitability depends on the exact model, installation method, maintenance plan, site conditions and local requirements. Confirm these points with the factory and your local project team before ordering.
Dimensions, doors, windows, room division, ventilation direction and selected material details can be discussed. Feasibility is confirmed for the chosen model and sample.

FROM PITCH PLAN TO PHYSICAL SAMPLE
Share the location, pitch dimensions, guest layout, unit count and operating requirements.
Discuss Your ProjectIllustrative design concept; confirm configuration and site suitability per project.